What is Putlog in scaffolding?

By Sarah Smith

Putlog scaffolding, otherwise known as bricklayer’s scaffolding or single scaffolding, is a system that involves using the wall of a building or structure as a support for the working platform. The ‘putlog’ is a component that links the wall and the ledger together.

What is a Putlog in construction?

Putlog holes (also referred to as putlock holes or putholes) are small gaps or recesses incorporated into the construction of a stone or brick wall. Their purpose is to support the short horizontal beams or round poles known as putlogs (or putlocks).

What is the Australian standard for scaffolds?

BD-036 : Scaffolding

DesignationTitle
AS/NZS 1576.3:1995Scaffolding, Part 3: Prefabricated and tube-and-coupler scaffolding

When would you use a putlog scaffold?

Putlog Scaffolds In order to use the wall as support, a putlog, a transom with a flattened end that enables it to rest solidly on the edge of a wall, is used to attach the scaffold to the wall. Putlog scaffolds can only be used on walls with adequate strength to support the weight of the scaffold and the putlog itself.

What is putlog coupler?

The putlog coupler is a non load bearing fitting that connects two scaffold tubes at 90 degrees to each other. They should only be used in the horizontal for connecting transoms to ledgers.

What is another term for putlog?

Scaffolding. Scaffolding, also called staging, is a temporary structure used to support people and material in the construction or repair of buildings and other structures.

At what height is scaffolding required?

In the general industry, the height requirement for scaffolding is 4 feet above a lower level. For construction work, the height requirement is 6 feet above a lower level. All workers 10 feet above a lower level must have fall protection.

At what height is scaffolding required Australia?

Scaffolding work is defined with a four metre threshold for licensing purposes. This means in some cases a high risk work licence may not be required to erect a scaffold—because it is less than four metres—but there may still be need for a SWMS because it is more than two metres. mobile plant.

What is bridle in scaffolding?

Bridle: This is a member used to bridge a wall opening; supports one end of the putlog at the opening.

What is a putlog scaffold?

A putlog scaffold consists of a single row of standards, parallel to the face of the building and set as far away from it as is necessary to accommodate a platform of four or five boards wide, with the inner edge of the platform as close to the wall as is practicable.

What is a single pole scaffold?

Single pole scaffold ~ A scaffold consisting of a single row of standards that are connected together by ledgers and putlogs fixed to ledgers and built into the wall of a building or structure. Also known as a brickies scaffold or a putlog scaffold. Tower scaffold ~ A scaffold of one bay erected in the form of a tower.

How many ties do I need for a putlog scaffold?

The same number of ties applies as for an independent tied scaffold. Reveal ties are not recommended for putlog scaffolds.

What are scaffolds used for?

Scaffolds are commonly used in construction work so workers have a safe, stable work platform when work cannot be done at ground level or on a finished floor. Scaffolding in this Guide means the individual components, for example tubes, couplers or frames and materials that when assembled form a scaffold.